-
Lindajeonj ha inviato un aggiornamento 4 anni, 10 mesi fa
Plain or Perforated 600×1200 Clip-in ceiling
1. Clip-In Ceiling Specification:
The ACEBOND Clip-In Tile system has a beveled edge to form visually closed joints. The 4.2 mm bevel will emphasize the crispness of the tile ceiling design with fine joint lines.
ACEBOND Clip-In Tiles are available in a wide variety of pre-defined rectangular module sizes that are commonly used in ceiling design.
Ceiling TypeSize(mm)Side Height(mm)Thickness(mm)Edge Type
Clip-in Ceiling300*30020/25/280.5~1.0Beveled /Square Edge
300*60020/25/280.6~1.0Beveled / Square Edge
300*120020/25/280.7~1.0Beveled / Square Edge
400*40020/25/280.6~1.0Beveled / Square Edge
500*50020/25/280.6~1.0Beveled / Square Edge
600*60020/25/280.6~1.2Beveled / Square Edge
600*120020/25/280.7~1.2Beveled / Square Edge
Product NameClip-in aluminum ceiling
Alloy1100,3003,3005,3105
Size300*300,300*600,300*1200,400*400,500*500,600*600,600*1200mm
Thickness0.5-1.2mm
Surface TreatmentPowder coating, roll coating, Film covered
EdgeBeveled /Square Edge
ShapeSquare
CertificatesCE, SGS, ISO, etc
PackagingCarton package
Delivery Time15-20 days after receiving the deposit and confirm the details
Payment T/T, L/C, Western Union
Samples are available for your reference. The MOQ is negotiable.2. Installation & Accessories
-Explosive Bolt
-Hanging Pole
-38 Main Keel Hanger
-38 Main Keel
-Triangle Keel
-Triangle Keel Hanger
-Clip in CeilingInstallation Drawing:
Accessories:3. Certificates
1) ISO
2) CE
OEM SERVICE PROCESS
1. Negotiation
We need to talk about the project requirements, to determine the order details.
2. R&D Samples
In order to ensure your interest, we will provide you samples. R & D and production of samples takes about 3-5 days by air delivered to you.
3. Material Procurement
If the sample is satisfied, We will take 12-18 days for production preparation, will be strictly in accordance with the need to control the quality of raw materials.
4. Mass Production
ISO9001:2000 & ISO14001 Standardized and automated production lines to ensure product quality and accurate delivery, Generally will be completed in 10 days.
5. Inspection & Traceability
We will ship the product before testing, photographed and retained samples for quality traceability.
6. We work with major shipping companies more than 10 years, will give you a reasonable freight and best service.Clip-in Ceiling
website:http://www.acebond.net/metal-ceiling/clip-in-ceiling/